Past Projects

Grace Bible Chruch - Creekside
2018 | Keys and Walsh
Ground broke in 2018 for the Creekside Campus of Grace Bible Church in south College Station. The slab varied in elevation and was designed as a carton form slab and beams on piers. Additionally, concrete stage on structural foam and a baptistery where made of concrete. In addition to the structural concrete, Tucker also poured the paving and architecturally designed flatwork.
ViaSat Offices
2017 | Whiting- Turner
A state of the art technology office building, Tucker Construction was contracted to construct the foundation from the piers, slab on voids and the tilt panels. Unique to this project was the architectural finish of the tilt panels that required the use of formliner along the face of each tilt panel. This was an intricate project that required significant coordination and attention to detail.
Texas Transportation Institute State Headquarters Building
2017 | Bartlett Cocke
Tucker Construction preformed the structural concrete work on the new Texas Transportation Institute's new headquarters building on the Texas A&M University's RELLIS campus. The project consisted of an elevated slab over a crawl space, concrete columns, and three levels of slab on metal deck.
The Leach Teaching Gardens - Texas A&M University
2016 | Quad-Tex Construction
Leach Teaching Gardens has more than seven acres for both outdoor teaching and demonstrations, this area is one of the nation’s premier teaching gardens. This project included many different intricate and complex architectural concrete features and Tucker Construction preformed the concrete work on this project. Concrete work included sidewalk with special finish and sawcut patters, rain features, and structural foundations.
Nutrabolt Headquarters
2015 | Beck
The Nutrabolt Headquarters is a LEED Certified building in the Bryan/College Station BioCorridor District. The building was design with a pier and beam structural foundation and precast tilt panels. As part of the concrete scope, Tucker Construction built the foundation and prepared and built the tilt panels.
TEEX Brayton Fire School
2015
Brayton Fire School required a building for live fire training that was designed to withstand extended periods of extreme heat. Walls were cast-in-place concrete and contained three stories. Tucker Construction was awarded and built the concrete structure - foundation and walls - per design requirements.
TEEX Brayton Fire School
2015
Brayton Fire School required a building for live fire training that was designed to withstand extended periods of extreme heat. Walls were cast-in-place concrete and contained three stories. Tucker Construction was awarded and built the concrete structure - foundation and walls - per design requirements.
Nutrabolt Headquarters
2015 | Beck
The Nutrabolt Headquarters is a LEED Certified building in the Bryan/College Station BioCorridor District. The building was design with a pier and beam structural foundation and precast tilt panels. As part of the concrete scope, Tucker Construction built the foundation and prepared and built the tilt panels.
The Leach Teaching Gardens - Texas A&M University
2016 | Quad-Tex Construction
Leach Teaching Gardens has more than seven acres for both outdoor teaching and demonstrations, this area is one of the nation’s premier teaching gardens. This project included many different intricate and complex architectural concrete features and Tucker Construction preformed the concrete work on this project. Concrete work included sidewalk with special finish and sawcut patters, rain features, and structural foundations.
Texas Transportation Institute State Headquarters Building
2017 | Bartlett Cocke
Tucker Construction preformed the structural concrete work on the new Texas Transportation Institute's new headquarters building on the Texas A&M University's RELLIS campus. The project consisted of an elevated slab over a crawl space, concrete columns, and three levels of slab on metal deck.
ViaSat Offices
2017 | Whiting- Turner
A state of the art technology office building, Tucker Construction was contracted to construct the foundation from the piers, slab on voids and the tilt panels. Unique to this project was the architectural finish of the tilt panels that required the use of formliner along the face of each tilt panel. This was an intricate project that required significant coordination and attention to detail.
Grace Bible Chruch - Creekside
2018 | Keys and Walsh
Ground broke in 2018 for the Creekside Campus of Grace Bible Church in south College Station. The slab varied in elevation and was designed as a carton form slab and beams on piers. Additionally, concrete stage on structural foam and a baptistery where made of concrete. In addition to the structural concrete, Tucker also poured the paving and architecturally designed flatwork.